2017 ORS 98.652¹
Effect of failure to remove trees, logs, poles or piling

Any trees, timber, logs, poles or piling which remain for a period of more than 30 days upon the right of way of any county road shall be conclusively presumed abandoned, and title thereto shall vest in the county having jurisdiction over such county road, and the county court or board of county commissioners of said county may remove, destroy, sell or otherwise dispose of the same. [1953 c.339 §2]

1 Legislative Counsel Committee, CHAPTER 98—Lost, Unclaimed or Abandoned Property; Vehicle Towing, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­ors098.­html (2017) (last ac­cessed Mar. 30, 2018).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.