2017 ORS 758.260¹
Competitive bidding for utility conversion

To the extent that the contract between the utility and the public authority provides that all or any part of the conversion work shall be performed by the utility, any statute or charter provision requiring competitive bidding and the award of a contract to the lowest responsible bidder does not apply. [1969 c.385 §11]

1 Legislative Counsel Committee, CHAPTER 758—Utility Rights of Way and Territory Allocation; Cogeneration, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­ors758.­html (2017) (last ac­cessed Mar. 30, 2018).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.