2015 ORS 549.340¹
Construction
  • functions of county surveyor or county engineer
  • performance by landowner

If the county court authorizes the improvement, it shall be done under the direction and supervision of the county surveyor, or the county engineer, who shall set all necessary grade stakes and bench marks. The owner of any of the lands through which or on which any portion of the improvement is to be constructed may, at the expense of the owner, perform such construction work under the supervision of the county surveyor, or the county engineer. If the owner does not elect to do such work, it shall be done by the county under the direction and supervision of the county surveyor, or the county engineer. [Amended by 1965 c.287 §2]


1 Legislative Counsel Committee, CHAPTER 549—Drainage and Flood Control Generally, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­ors549.­html (2015) (last ac­cessed Jul. 16, 2016).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.