2017 ORS 541.525¹
Hearing upon request of owner or operator of structure
  • notice and conduct of hearing

(1) If, within 15 days after mailing of the notice provided for in ORS 541.515 (Notice by commission when hazard created by release of stored water), the owner or operator of the impoundment or diversion structure requests in writing that the Water Resources Commission hold a hearing, the commission shall hold a hearing in accordance with ORS chapter 183 on the hazard to human life or property which is or will be created by the rapid increase in the stream level below the structure resulting from the release of water from the structure and the terms, limitations and conditions relating to such release of water necessary to minimize such unreasonable hazard.

(2) At least 10 days prior to the hearing the commission, in addition to the notice requirements of ORS chapter 183, shall cause a copy of the notice to be published in a newspaper of general circulation in each county in which the structure is located and in which unreasonable hazard to human life or property is or may be created. [1961 c.379 §3; 1971 c.734 §83; 1985 c.673 §107]

1 Legislative Counsel Committee, CHAPTER 541—Water Distributors; Water Releases; Conservation and Storage; Water Development Projects; Watershed Management and Enhancement, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­ors541.­html (2017) (last ac­cessed Mar. 30, 2018).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.