2017 ORS 469.717¹
When installation to be completed

(1) Installation of the energy conservation measures must be completed within 90 days after receipt of loan funds. The State Department of Energy may provide an inspection at the owner’s request.

(2) Notwithstanding the provisions of subsection (1) of this section, the department may inspect installation of energy conservation measures to verify that all loan or other state subsidy funds have been used for energy conservation measures recommended in the audit, that installation has been performed in a workmanlike manner and that materials used satisfy prevailing industry standards. If requested to do so by the department, the dwelling owner shall provide the department with copies of receipts and any other documents verifying the cost of energy conservation measures. [1987 c.749 §3]

1 Legislative Counsel Committee, CHAPTER 469—Energy; Conservation Programs; Energy Facilities, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­ors469.­html (2017) (last ac­cessed Mar. 30, 2018).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.