2007 ORS 87.356¹
Lien for preparing land for irrigation or cultivation

A person who is employed to or contracts to survey, clear, ditch, dike, tile, level, check, border, excavate, grade, pave or otherwise prepare land for irrigation or cultivation, or who furnishes materials or equipment for use in connection with such work on that land, at the request of the owner of the land, has a lien on the land prepared for the reasonable or agreed charges for labor, and the materials or equipment furnished. If the owner has less than a fee simple estate in the land, then only the interest of the owner therein is subject to the lien created by this section. [1975 c.648 §42; 1977 c.596 §3]

1 Legislative Counsel Committee, CHAPTER 87—Statutory Liens, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­087.­html (2007) (last ac­cessed Feb. 12, 2009).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.