ORS 759.215¹
Public access to schedules

(1) A copy of so much of all schedules, including schedules of joint rates and charges, as the Public Utility Commission deems necessary for the use of the public, shall be made available to the public.

(2) Except as provided in ORS 759.410 (Intent of ORS 759.410) (8), copies of all new schedules shall be made readily accessible to the public as required by the commission 30 days prior to the time the schedules are to take effect, unless the commission prescribes a shorter time. [1987 c.447 §18; 2005 c.232 §19]

1 Legislative Counsel Committee, CHAPTER 759—Telecommunications Utility Regulation, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­759.­html (2007) (last ac­cessed Feb. 12, 2009).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent. Currency Information