ORS
540.360¹
Order to modify
After the hearing the Water Resources Commission may issue a written order to the owners to make such modifications as the commission considers necessary to insure the safety of the works with reference to possible damage to life or property and shall fix the time within which work shall begin in good faith and the time for completion. The owners, upon receipt of the order, shall make the modifications ordered within the time limit prescribed or shall initiate an appeal as above provided. [Amended by 1975 c.581 §26a; 1981 c.210 §2; 1985 c.673 §89]
1 Legislative Counsel Committee, CHAPTER 540—Distribution of Water; Watermasters; Change in Use, Transfer or Forfeiture of Water Rights, https://www.oregonlegislature.gov/bills_laws/Archive/2007ors540.pdf (2007) (last accessed Feb. 12, 2009).
2 Legislative Counsel Committee, Annotations to the Oregon Revised Statutes, Cumulative Supplement - 2007, Chapter 540, https://www.oregonlegislature.gov/bills_laws/ors/540ano.htm (2007) (last accessed Feb. 12, 2009).
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent. Currency Information
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent. Currency Information