2007 ORS 479.870¹
Electrical and Elevator Board to prescribe uniform fee calculation and permit format
  • review
  • rules

(1) The Electrical and Elevator Board shall provide by rule for a statewide uniform method of calculating permit fees and a standardized permit application format.

(2) Notwithstanding the provisions of subsection (1) of this section, the board shall provide by rule for a separate limited energy electrical activity permit and the conditions that apply to the permit.

(3) The board shall adopt rules setting standards for timely review, personnel to conduct review and other plan review requirements. [1989 c.591 §2; 1991 c.529 §9; subsection (3) enacted as 1991 c.439 §2; 2001 c.728 §3]

1 Legislative Counsel Committee, CHAPTER 479—Protection of Buildings From Fire; Electrical Safety Law, https://­www.­oregonlegislature.­gov/­bills_laws/­ors/­479.­html (2007) (last ac­cessed Feb. 12, 2009).
 
2 OregonLaws.org contains the con­tents of Volume 21 of the ORS, inserted along­side the per­tin­ent statutes. See the preface to the ORS An­no­ta­tions for more information.
 
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent.