274.840¹
Continuation of lease after cessation of production
In the event production on the leasehold shall cease at any time or from time to time, before or after the expiration of the primary term of the lease, the lease shall nevertheless continue in full force and effect if the lessee shall, within six months after the cessation of production or within such longer period of time as the Department of State Lands may authorize, commence and thereafter prosecute with reasonable diligence drilling, deepening, repairing, redrilling or other operations for the restoration of production of oil, gas or sulfur from the leased lands. [1961 c.619 §15]
1 Legislative Counsel Committee, CHAPTER 274—Submersible and Submerged Lands, https://www.oregonlegislature.gov/bills_laws/Archive/2007ors274.pdf (2007) (last accessed Feb. 12, 2009).
2 Legislative Counsel Committee, Annotations to the Oregon Revised Statutes, Cumulative Supplement - 2007, Chapter 274, https://www.oregonlegislature.gov/bills_laws/ors/274ano.htm (2007) (last accessed Feb. 12, 2009).
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent. Currency Information
3 OregonLaws.org assembles these lists by analyzing references between Sections. Each listed item refers back to the current Section in its own text. The result reveals relationships in the code that may not have otherwise been apparent. Currency Information