2013 ORS § 285B.560¹
Definitions for ORS 285B.560 to 285B.599

As used in ORS 285B.560 (Definitions for ORS 285B.560 to 285B.599) to 285B.599 (Effect of failure to repay to Water Fund):

(1) Direct project management costs means new expenses incurred by a municipality solely to support, plan for and manage an infrastructure project, funded in whole or in part through financial assistance under ORS 285B.560 (Definitions for ORS 285B.560 to 285B.599) to 285B.599 (Effect of failure to repay to Water Fund), during the planning and construction phases of the project.

(2) Fund means the Water Fund.

(3) Municipality has the meaning given that term in ORS 285B.410 (Definitions for ORS 285B.410 to 285B.482).

(4) Safe drinking water project means a project for constructing or improving a drinking water system or a water development project, as defined in ORS 541.700 (Definitions for ORS 541.700 to 541.855) (6)(a), (b) and (d) to (f), that is owned and operated by a municipality.

(5) Waste water system improvement project means a project for constructing or improving a system for waste water collection or treatment, including storm drainage systems.

(6) Water project means a safe drinking water project or a waste water system improvement project. [Formerly 285.755 [bad link]; 2001 c.883 §36; 2009 c.830 §121]